BPA-G0640
239 MW generation in Klamath, OR · In queue since February 2020 · Proposed COD December 2025
239 MW
Capacity
1
Components
Wind
6y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
5y 10m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
BPA-G0640 is a proposed wind generation project with a total capacity of 239 MW, located in Klamath County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of February 10, 2020. The proposed commercial operation date is December 31, 2025.
The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) options include a new 230 kV point onto BPA's existing 500 kV Captain Jack Substation, a new 230 kV point onto BPA's existing Malin Substation, or a new 230 kV facility adjacent to BPA's Malin Hilltop 230 kV line, approximately adjacent to the Malin Substation.
Generated from interconnection queue and public data sources
State
OR
County
Klamath
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Option I: New 230 kV point onto BPA's existing 500 kV Captain Jack Substation; Option 2: New 230 kV point onto BPA's existing Malin Substation; Option 3: New 230 kV facility adjacent to BPA's Malin Hilltop 230 kV line, approx. adjacent to the Malin Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0640