BPA-G0648
1,400 MW hybrid in Klamath, OR · In queue since May 2020 · Proposed COD December 2026
1,400 MW
Capacity
2
Components
Solar + Battery
6 years
In Queue
Facility Study
IA Status
COD target: 2026
Total Duration
6y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-12-31
BPA-G0648 is a proposed 1400 MW hybrid Solar+Battery project located in Klamath County, Oregon. The project, which appeared in recent news coverage, consists of a 300 MW solar component and an 1100 MW battery energy storage system. It is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of May 29, 2020.
The project's proposed commercial operation date is December 31, 2026. Its interconnection status is currently in the Facility Study phase, and the point of interconnection is the Captain Jack 500 kV Substation.
Generated from interconnection queue and public data sources
State
OR
County
Klamath
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Captain Jack 500 kV Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.