BPA-G0651
400 MW generation in Lake, OR · In queue since July 2020 · Proposed COD September 2023
400 MW
Capacity
1
Components
Solar
5y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
3y 2m
Schedule
32 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-09-30
BPA-G0651 is a proposed solar generation project with a total capacity of 400 MW, located in Lake County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of July 8, 2020. The proposed commercial operation date is September 30, 2023.
The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Grizzly-Summer Lake No 1 500 kV line. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
OR
County
Lake
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Grizzly-Summer Lake No 1 500 kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0651