Project BPA-G0662 — Project Summary

Queue ID
BPA-G0662
Capacity
600 MW
Technology
Solar+Battery
Status
active
Location
Deschutes, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0662

BPA-G0662BetaActiveSolarBatteryBPALBNL

600 MW hybrid in Deschutes, OR · In queue since December 2020 · Proposed COD December 2025

600 MW

Capacity

2

Components

Solar + Battery

5y 5m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

5 years

Schedule

5 months past proposed COD

In Study38%
Queue EntryDec 21, 2020

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-01

Technology
Solar400 MW · 67%
Battery200 MW · 33%
About

BPA-G0662 is a proposed 600 MW hybrid solar and battery project located in Deschutes County, Oregon. The project, consisting of 400 MW of solar generation and 200 MW of battery storage, is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of December 21, 2020. The proposed commercial operation date is December 1, 2025.

The interconnection agreement (IA) status for BPA-G0662 is listed as "In Progress (unknown study)". The point of interconnection (POI) is either the Pilot Butte to Redmond 230kV line or the Pilot Butte to Ponderosa 230kV line.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Deschutes

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Pilot Butte to Redmond 230kV or Pilot Butte to Ponderosa 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.