BPA-G0676
250 MW hybrid in Klickitat, WA · In queue since March 2021 · Proposed COD September 2024
250 MW
Capacity
2
Components
Solar + Battery
5y 2m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
3y 6m
Schedule
20 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-09-01
BPA-G0676 is a proposed 250 MW hybrid Solar+Battery project located in Klickitat County, Washington. The project consists of 125 MW of solar generation and a 125 MW battery energy storage system. It is listed in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of March 29, 2021.
The proposed commercial operation date for BPA-G0676 is September 1, 2024. The interconnection agreement (IA) status is currently "In Progress (unknown study)". The point of interconnection (POI) is the Spring Creek Substation at 230 kV. The project has appeared in recent news coverage.
Generated from interconnection queue and public data sources
State
WA
County
Klickitat
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Spring Creek Substation 230 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0676