BPA-G0689
13.3 MW generation in Franklin, WA · In queue since September 2021 · Proposed COD December 2023
13.3 MW
Capacity
1
Components
Solar
4y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2023
Total Duration
2y 3m
Schedule
28 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-12-31
BPA-G0689 is a proposed solar generation project located in Franklin County, Washington, with a total capacity of 13.3 MW. The project is listed in the Bonneville Power Administration interconnection queue with an entry date of September 7, 2021, and a proposed commercial operation date of December 31, 2023. The interconnection agreement status is listed as "In Progress (unknown study)".
The point of interconnection for BPA-G0689 is the Connell Tap on the Benton-Scooteney line.
Generated from interconnection queue and public data sources
State
WA
County
Franklin
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Connell Tap on the Benton-Scooteney line.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0689