BPA-G0691
130 MW hybrid in Benton, WA · In queue since September 2021 · Proposed COD October 2023
130 MW
Capacity
2
Components
Solar + Battery
4y 8m
In Queue
Facility Study
IA Status
COD target: 2023
Total Duration
2y 1m
Schedule
31 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2023-10-23
BPA-G0691 is a proposed 130 MW hybrid Solar+Battery project located in Benton County, Washington. The development project consists of a 100 MW solar array coupled with a 30 MW battery energy storage system. It is listed in the Bonneville Power Administration interconnection queue with a queue entry date of September 13, 2021.
The proposed commercial operation date for BPA-G0691 is October 23, 2023. The project's interconnection status is currently in the Facility Study phase. The point of interconnection is the Bofer Substation.
Generated from interconnection queue and public data sources
State
WA
County
Benton
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Bofer Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.