Project BPA-G0710 — Project Summary

Queue ID
BPA-G0710
Capacity
1.6 MW
Technology
Other
Status
active
Location
Flathead, MT
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0710

BPA-G0710BetaActiveBiofuelBPALBNL

1.6 MW generation in Flathead, MT · In queue since November 2021 · Proposed COD September 2022

1.6 MW

Capacity

1

Components

Biofuel

4y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2022

Interconnection

Total Duration

10 months

Schedule

45 months past proposed COD

In Study38%
Queue EntryNov 2, 2021

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2022-09-01

About

BPA-G0710 is a proposed 1.6 MW biofuel generation project located in Flathead County, Montana. The project is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of November 2, 2021. The proposed commercial operation date is September 1, 2022.

The interconnection agreement for BPA-G0710 is currently in progress, with the specific study type unknown. The point of interconnection is the Flathead Substation.

Generated from interconnection queue and public data sources

Project Details

State

MT

County

Flathead

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Flathead Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.