Project BPA-G0738 — Project Summary

Queue ID
BPA-G0738
Capacity
85 MW
Technology
Solar+Battery
Status
active
Location
Umatilla, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0738

BPA-G0738BetaActiveSolarBatteryBPALBNL

85 MW hybrid in Umatilla, OR · In queue since April 2022 · Proposed COD December 2025

85 MW

Capacity

2

Components

Solar + Battery

4y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 8m

Schedule

5 months past proposed COD

In Study38%
Queue EntryApr 26, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-01

Technology
Solar60 MW · 71%
Battery25 MW · 29%
About

BPA-G0738 is a proposed 85 MW hybrid solar and battery project located in Umatilla County, Oregon. The project consists of a 60 MW solar array coupled with a 25 MW battery energy storage system. It is listed in the Bonneville Power Administration (BPA) interconnection queue with a queue entry date of April 26, 2022, and a proposed commercial operation date of December 1, 2025.

The interconnection request, designated BPA-G0738, is currently listed as "In Progress (unknown study)" for its Interconnection Agreement (IA) status. The point of interconnection (POI) is BPA's Morrow Flat 230 kV substation. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Umatilla

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

BPA_x0019_s Morrow Flat 230 kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0738