85 MW hybrid in Umatilla, OR · In queue since April 2022 · Proposed COD December 2025
85 MW
Capacity
2
Components
Solar + Battery
4y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 8m
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-01
BPA-G0738 is a proposed 85 MW hybrid solar and battery project located in Umatilla County, Oregon. The project consists of a 60 MW solar array coupled with a 25 MW battery energy storage system. It is listed in the Bonneville Power Administration (BPA) interconnection queue with a queue entry date of April 26, 2022, and a proposed commercial operation date of December 1, 2025.
The interconnection request, designated BPA-G0738, is currently listed as "In Progress (unknown study)" for its Interconnection Agreement (IA) status. The point of interconnection (POI) is BPA's Morrow Flat 230 kV substation. The project is currently listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
OR
County
Umatilla
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
BPA_x0019_s Morrow Flat 230 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0738