Project BPA-G0753 — Project Summary

Queue ID
BPA-G0753
Capacity
515 MW
Technology
Solar+Battery
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0753

BPA-G0753BetaActiveSolarBatteryBPALBNL

515 MW hybrid in Douglas, WA · In queue since June 2022 · Proposed COD December 2025

515 MW

Capacity

2

Components

Solar + Battery

3y 11m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 6m

Schedule

4 months past proposed COD

In Study38%
Queue EntryJun 16, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

Technology
Solar215 MW · 42%
Battery300 MW · 58%
About

BPA-G0753 is a proposed 515 MW hybrid solar and battery project located in Douglas County, Washington. The development project consists of 215 MW of solar generation coupled with 300 MW of battery storage. It is listed in the Bonneville Power Administration interconnection queue as of June 16, 2022, with a proposed commercial operation date of December 31, 2025.

The interconnection agreement for BPA-G0753 is currently listed as "In Progress (unknown study)". The point of interconnection is the 5-mile 230kV Gen Tie to Columbia 230 kV Substation. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

5-mile 230kV Gen Tie to Columbia 230 kV Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.