Project BPA-G0761 — Project Summary

Queue ID
BPA-G0761
Capacity
290 MW
Technology
Wind
Status
active
Location
Grant, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0761

BPA-G0761BetaActiveWindBPALBNL

290 MW generation in Grant, WA · In queue since June 2022 · Proposed COD June 2026

290 MW

Capacity

1

Components

Wind

3y 11m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

4 years

In Study38%
Queue EntryJun 23, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-06-30

About

BPA-G0761 is a proposed wind generation project with a total capacity of 290 MW, located in Grant County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of June 23, 2022. The proposed commercial operation date is June 30, 2026.

The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is yet to be determined. The developer is currently unknown. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Grant

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

TBD

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.