Project BPA-G0797 — Project Summary

Queue ID
BPA-G0797
Capacity
1300 MW
Technology
Solar+Battery
Status
active
Location
Wasco, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0797

BPA-G0797BetaActiveSolarBatteryBPALBNL

1,300 MW hybrid in Wasco, OR · In queue since August 2022 · Proposed COD December 2028

1,300 MW

Capacity

2

Components

Solar + Battery

3y 9m

In Queue

In Progress (unknown study)

IA Status

COD target: 2028

Interconnection

Total Duration

6y 4m

In Study38%
Queue EntryAug 18, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2028-12-01

Technology
Solar650 MW · 50%
Battery650 MW · 50%
About

BPA-G0797 is a proposed 1300 MW hybrid solar and battery project located in Wasco County, Oregon. The development project consists of 650 MW of solar capacity paired with 650 MW of battery storage. It is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of August 18, 2022, and a proposed commercial operation date of December 1, 2028.

The interconnection agreement (IA) status for the project is listed as "In Progress (unknown study)". The point of interconnection (POI) is the BPA 500 KV John Day-Marion transmission line. The project has appeared in recent news coverage.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Wasco

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

BPA 500 KV John Day-Marion transmission line.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.