BPA-G0809
600 MW storage in Douglas, OR · In queue since September 2022 · Proposed COD December 2030
600 MW
Capacity
1
Components
Pumped Storage
3y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2030
Total Duration
8y 3m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-10
BPA-G0809 is a proposed 600 MW pumped storage battery project located in Douglas County, Oregon. The development project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of September 16, 2022, and a proposed commercial operation date of December 10, 2030.
The interconnection agreement (IA) status for the project is listed as "In Progress (unknown study)". The point of interconnection (POI) is specified as either BPA's Gardiner 230 kV Substation or Tahkenitch 230 kV Substation. The project is sponsored by BPA.
Generated from interconnection queue and public data sources
State
OR
County
Douglas
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
BPA's Gardiner 230 kV Substation or Tahkenitch 230 kV Substation.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0809