BPA-G0817
325 MW hybrid in Yakima, WA · In queue since October 2022 · Proposed COD December 2025
325 MW
Capacity
2
Components
Solar + Battery
3y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
3y 2m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
BPA-G0817 is a proposed 325 MW hybrid solar and battery project located in Yakima County, Washington. The project, which appeared in the Bonneville Power Administration interconnection queue on October 3, 2022, consists of 215 MW of solar generation and 110 MW of battery energy storage. The proposed commercial operation date is December 31, 2025.
The interconnection request is currently listed as "In Progress (unknown study)". The point of interconnection is the Spring Creek-Wine Country #1 line between the Spring Creek and Mabton Substations.
Generated from interconnection queue and public data sources
State
WA
County
Yakima
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Spring Creek-Wine Country #1 between Spring Creek and Mabton Substation.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN