Project BPA-G0818 — Project Summary

Queue ID
BPA-G0818
Capacity
3 MW
Technology
Solar
Status
active
Location
Wasco, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0818

BPA-G0818BetaActiveSolarBPALBNL

3 MW generation in Wasco, OR · In queue since October 2022 · Proposed COD December 2025

3 MW

Capacity

1

Components

Solar

3y 7m

In Queue

In Progress (unknown study)

IA Status

COD target: 2025

Interconnection

Total Duration

3y 2m

Schedule

4 months past proposed COD

In Study38%
Queue EntryOct 20, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2025-12-31

About

BPA-G0818 is a proposed solar generation project located in Wasco County, Oregon, with a total capacity of 3 MW. The project is listed in the Bonneville Power Administration interconnection queue, with an entry date of October 20, 2022, and a proposed commercial operation date of December 31, 2025. The point of interconnection is the Maupin-Tygh Valley #1 69 kV line.

The interconnection agreement for the project is currently listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Wasco

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Maupin-Tygh Valley #1 69 kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.