Project BPA-G0819 — Project Summary

Queue ID
BPA-G0819
Capacity
200 MW
Technology
Wind
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0819

BPA-G0819BetaActiveWindBPALBNL

200 MW generation in Douglas, WA · In queue since November 2022 · Proposed COD December 2027

200 MW

Capacity

1

Components

Wind

3y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

5y 1m

In Study38%
Queue EntryNov 2, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-01

About

BPA-G0819 is a proposed 200 MW wind generation project located in Douglas County, Washington. The project is listed in the Bonneville Power Administration interconnection queue with an entry date of November 2, 2022. The proposed commercial operation date is December 1, 2027.

The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Columbia-Grand Coulee No 1 230kV line. The project has appeared in recent news.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Columbia-Grand Coulee No 1 230kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.