Project BPA-G0822 — Project Summary

Queue ID
BPA-G0822
Capacity
4000 MW
Technology
Solar+Battery
Status
active
Location
Benton, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0822

BPA-G0822BetaActiveSolarBatteryBPALBNL

4,000 MW hybrid in Benton, WA · In queue since November 2022 · Proposed COD December 2026

4,000 MW

Capacity

2

Components

Solar + Battery

3y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

4y 1m

In Study38%
Queue EntryNov 14, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-01

Technology
Solar2,000 MW · 50%
Battery2,000 MW · 50%
About

BPA-G0822 is a proposed 4000 MW hybrid solar and battery project located in Benton County, Washington. The development project, consisting of 2000 MW of solar and 2000 MW of battery storage, is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 14, 2022. The proposed commercial operation date is December 1, 2026.

The interconnection agreement (IA) status for BPA-G0822 is listed as "In Progress (unknown study)". The point of interconnection (POI) is identified as the Ashe Substation, or the Ashe - Marion No 2 500 kV line, or the Ashe - Slatt No 1 500 kV line.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Benton

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Ashe Substation, or Ashe - Marion No 2 500 kV line, or Ashe - Slatt No 1 500 kV line.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.