BPA-G0826
560 MW hybrid in Klamath, OR · In queue since November 2022 · Proposed COD December 2027
560 MW
Capacity
2
Components
Solar + Battery
3y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
5y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
BPA-G0826 is a proposed 560 MW hybrid solar and battery project located in Klamath County, Oregon. The development project consists of 280 MW of solar capacity and 280 MW of battery storage. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 20, 2022, and a proposed commercial operation date of December 31, 2027.
The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is primarily the Grizzly - Summer Lake No 1 500 kV line, with a secondary POI at the Grizzly - Captain Jack No 1 500 kV line.
Generated from interconnection queue and public data sources
State
OR
County
Klamath
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Primary: Grizzly - Summer Lake No 1 500 kV line. Secondary: Grizzly - Captain Jack No 1 500 kV line.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.