Project BPA-G0826 — Project Summary

Queue ID
BPA-G0826
Capacity
560 MW
Technology
Solar+Battery
Status
active
Location
Klamath, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0826

BPA-G0826BetaActiveSolarBatteryBPALBNL

560 MW hybrid in Klamath, OR · In queue since November 2022 · Proposed COD December 2027

560 MW

Capacity

2

Components

Solar + Battery

3y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

5y 1m

In Study38%
Queue EntryNov 20, 2022

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

Technology
Solar280 MW · 50%
Battery280 MW · 50%
About

BPA-G0826 is a proposed 560 MW hybrid solar and battery project located in Klamath County, Oregon. The development project consists of 280 MW of solar capacity and 280 MW of battery storage. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 20, 2022, and a proposed commercial operation date of December 31, 2027.

The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is primarily the Grizzly - Summer Lake No 1 500 kV line, with a secondary POI at the Grizzly - Captain Jack No 1 500 kV line.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Klamath

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Primary: Grizzly - Summer Lake No 1 500 kV line. Secondary: Grizzly - Captain Jack No 1 500 kV line.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.