BPA-G0832
25 MW storage in Snohomish, WA · In queue since December 2022 · Proposed COD October 2025
25 MW
Capacity
1
Components
Battery
3y 5m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 10m
Schedule
6 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-31
BPA-G0832 is a proposed 25 MW battery storage project located in Snohomish County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of December 22, 2022. The proposed commercial operation date is October 31, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".
The development project consists solely of battery storage, with a total capacity of 25 MW. The point of interconnection is the Murray: Snohomish Co PUD 115 kV Feeder 1.
Generated from interconnection queue and public data sources
State
WA
County
Snohomish
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Murray: Snohomish Co PUD 115 kV Feeder 1
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0832