BPA-G0847
150 MW generation in Columbia, WA · In queue since February 2023 · Proposed COD December 2024
150 MW
Capacity
1
Components
Solar
3y 3m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
1y 10m
Schedule
16 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-12-30
BPA-G0847 is a proposed solar generation project located in Columbia County, Washington, with a total capacity of 150 MW. The project is listed in the Bonneville Power Administration (BPA) interconnection queue, under queue ID BPA-G0847, with an entry date of February 24, 2023. The proposed commercial operation date is December 30, 2024.
The interconnection agreement (IA) status for the project is listed as "In Progress (unknown study)". The point of interconnection (POI) is PSE's Phalen Gulch 230kV Substation.
Generated from interconnection queue and public data sources
State
WA
County
Columbia
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
PSE's Phalen Gulch 230kV Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0847