BPA-G0854
600 MW hybrid in Umatilla, OR · In queue since April 2023 · Proposed COD December 2025
600 MW
Capacity
2
Components
Solar + Wind
3y 1m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 8m
Schedule
5 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-01
BPA-G0854 is a proposed 600 MW hybrid solar and wind project located in Umatilla County, Oregon. The development project consists of 300 MW of solar capacity and 300 MW of wind capacity. It is listed in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of April 11, 2023, and a proposed commercial operation date of December 1, 2025.
The interconnection agreement (IA) status for BPA-G0854 is listed as "In Progress (unknown study)". The point of interconnection (POI) is the McNary-Quarry Switchyard No 1 230 kV line.
Generated from interconnection queue and public data sources
State
OR
County
Umatilla
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
McNary-Quarry Switchyard No 1 230 kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.