Project BPA-G0858 — Project Summary

Queue ID
BPA-G0858
Capacity
130 MW
Technology
Battery
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0858

BPA-G0858BetaActiveBatteryBPALBNL

130 MW storage in Douglas, WA · In queue since April 2023 · Proposed COD December 2026

130 MW

Capacity

1

Components

Battery

3y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

3y 8m

In Study38%
Queue EntryApr 14, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

About

BPA-G0858 is a proposed 130 MW battery storage project located in Douglas County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of April 14, 2023. The proposed commercial operation date is December 31, 2026.

The interconnection agreement (IA) status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Columbia Substation at 230kV. The development project is sponsored by BPA.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Columbia Substation @ 230kV

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0858