Project BPA-G0860 — Project Summary

Queue ID
BPA-G0860
Capacity
300 MW
Technology
Wind
Status
active
Location
Lincoln, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0860

BPA-G0860BetaActiveWindBPALBNL

300 MW generation in Lincoln, WA · In queue since April 2023 · Proposed COD December 2027

300 MW

Capacity

1

Components

Wind

3y 1m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

4y 8m

In Study38%
Queue EntryApr 25, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-12-31

About

The BPA-G0860 development project is a proposed 300 MW wind generation facility located in Lincoln County, Washington. The project is listed in the Bonneville Power Administration interconnection queue, with an entry date of April 25, 2023, and a proposed commercial operation date of December 31, 2027. Its point of interconnection is the Grand Coulee-Bell No 5 230kV line.

The interconnection agreement for the project is currently listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Lincoln

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Grand Coulee-Bell No 5 230kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.