BPA-G0865
300 MW hybrid in Sherman, OR · In queue since June 2023 · Proposed COD September 2027
300 MW
Capacity
2
Components
Solar + Battery
2y 11m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
4y 3m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-09-01
BPA-G0865 is a proposed 300 MW hybrid Solar+Battery project located in Sherman County, Oregon. The development project consists of a 200 MW solar array coupled with a 100 MW battery energy storage system. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of June 2, 2023, and a proposed commercial operation date of September 1, 2027.
The interconnection agreement (IA) for BPA-G0865 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) for the project is the Buckley Substation.
Generated from interconnection queue and public data sources
State
OR
County
Sherman
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Buckley Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0865