Project BPA-G0878 — Project Summary

Queue ID
BPA-G0878
Capacity
160 MW
Technology
Battery
Status
active
Location
Lane, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0878

BPA-G0878BetaActiveBiofuelBatteryBPALBNL

160 MW hybrid in Lane, OR · In queue since June 2023 · Proposed COD December 2030

160 MW

Capacity

2

Components

Biofuel + Battery

2y 11m

In Queue

In Progress (unknown study)

IA Status

COD target: 2030

Interconnection

Total Duration

7y 6m

In Study38%
Queue EntryJun 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-02

Technology
Biofuel80 MW · 50%
Battery80 MW · 50%
About

BPA-G0878 is a proposed 160 MW hybrid generation project located in Lane County, Oregon. The project, which appeared in the Bonneville Power Administration (BPA) interconnection queue on June 30, 2023, consists of an 80 MW biofuel component and an 80 MW battery energy storage system. The proposed commercial operation date is December 2, 2030.

The project's interconnection to the grid is planned at the Albany-Lebanon No. 1 115kV line. Its interconnection agreement status is currently listed as "In Progress (unknown study)" within the BPA queue. The project has appeared in recent news coverage regarding the growth of hybrid power projects in the Pacific Northwest.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Lane

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Albany-Lebanon No. 1 115kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.