Project BPA-G0905 — Project Summary

Queue ID
BPA-G0905
Capacity
400 MW
Technology
Battery
Status
active
Location
Linn, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0905

BPA-G0905BetaActiveBiofuelBatteryBPALBNL

400 MW hybrid in Linn, OR · In queue since June 2023 · Proposed COD December 2030

400 MW

Capacity

2

Components

Biofuel + Battery

2y 11m

In Queue

In Progress (unknown study)

IA Status

COD target: 2030

Interconnection

Total Duration

7y 6m

In Study38%
Queue EntryJun 30, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-12-01

Technology
Biofuel200 MW · 50%
Battery200 MW · 50%
About

BPA-G0905 is a proposed 400 MW hybrid development project located in Linn County, Oregon. The project, which combines biofuel and battery technologies, consists of a 200 MW biofuel component and a 200 MW battery component. It is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of June 30, 2023, and a proposed commercial operation date of December 1, 2030.

The interconnection agreement (IA) status for BPA-G0905 is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Santiam-Chemawa No 1 230kV line. The project is currently listed as active in the interconnection queue.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Linn

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Santiam-Chemawa No 1 230kV line.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0905