BPA-G0905
400 MW hybrid in Linn, OR · In queue since June 2023 · Proposed COD December 2030
400 MW
Capacity
2
Components
Biofuel + Battery
2y 11m
In Queue
In Progress (unknown study)
IA Status
COD target: 2030
Total Duration
7y 6m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-01
BPA-G0905 is a proposed 400 MW hybrid development project located in Linn County, Oregon. The project, which combines biofuel and battery technologies, consists of a 200 MW biofuel component and a 200 MW battery component. It is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of June 30, 2023, and a proposed commercial operation date of December 1, 2030.
The interconnection agreement (IA) status for BPA-G0905 is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Santiam-Chemawa No 1 230kV line. The project is currently listed as active in the interconnection queue.
Generated from interconnection queue and public data sources
State
OR
County
Linn
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Santiam-Chemawa No 1 230kV line.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0905