BPA-G0909
400 MW hybrid in Deschutes, OR · In queue since July 2023 · Proposed COD November 2028
400 MW
Capacity
2
Components
Solar + Battery
2y 10m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
5y 4m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-11-01
BPA-G0909 is a proposed 400 MW hybrid Solar+Battery project located in Deschutes County, Oregon. The project, which consists of 200 MW of solar generation and 200 MW of battery energy storage, is interconnected to the Bonneville Power Administration (BPA) at the LaPine Substation.
The project entered the BPA interconnection queue on July 18, 2023, with a proposed commercial operation date of November 1, 2028. Its interconnection agreement status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OR
County
Deschutes
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
LaPine Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0909