Project BPA-G0932 — Project Summary

Queue ID
BPA-G0932
Capacity
800 MW
Technology
Solar+Battery
Status
active
Location
Benton, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0932

BPA-G0932BetaActiveSolarBatteryBPALBNL

800 MW hybrid in Benton, WA · In queue since September 2023 · Proposed COD December 2029

800 MW

Capacity

2

Components

Solar + Battery

2y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2029

Interconnection

Total Duration

6y 3m

In Study38%
Queue EntrySep 7, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-31

Technology
Solar400 MW · 50%
Battery400 MW · 50%
About

BPA-G0932 is a proposed 800 MW hybrid solar and battery project located in Benton County, Washington. The project, which appeared in the Bonneville Power Administration interconnection queue on September 7, 2023, consists of 400 MW of solar generation and 400 MW of battery energy storage. Its proposed commercial operation date is December 31, 2029.

The project's interconnection to the grid, at the McNary-John Day No 2 500kV line, is currently listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Benton

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

McNary-John Day No 2 500kV line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.