BPA-G0932
800 MW hybrid in Benton, WA · In queue since September 2023 · Proposed COD December 2029
800 MW
Capacity
2
Components
Solar + Battery
2y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2029
Total Duration
6y 3m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-12-31
BPA-G0932 is a proposed 800 MW hybrid solar and battery project located in Benton County, Washington. The project, which appeared in the Bonneville Power Administration interconnection queue on September 7, 2023, consists of 400 MW of solar generation and 400 MW of battery energy storage. Its proposed commercial operation date is December 31, 2029.
The project's interconnection to the grid, at the McNary-John Day No 2 500kV line, is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
WA
County
Benton
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
McNary-John Day No 2 500kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.