Project BPA-G0935 — Project Summary

Queue ID
BPA-G0935
Capacity
225 MW
Technology
Solar
Status
active
Location
Walla Walla, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0935

BPA-G0935BetaActiveSolarBPALBNL

225 MW generation in Walla Walla, WA · In queue since September 2023 · Proposed COD September 2027

225 MW

Capacity

1

Components

Solar

2y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2027

Interconnection

Total Duration

4 years

In Study38%
Queue EntrySep 13, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2027-09-15

About

The proposed project BPA-G0935 is a 225 MW solar generation project located in Walla Walla County, Washington. The project was entered into the Bonneville Power Administration (BPA) interconnection queue on September 13, 2023, with a proposed commercial operation date of September 15, 2027. The point of interconnection is the Central Ferry-Lower Monumental No 1 500 kV Line.

The interconnection agreement for project BPA-G0935 is currently listed as "In Progress (unknown study)".

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Walla Walla

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Central Ferry-Lower Monumental No 1 500 kV Line

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.