BPA-G0937
117 MW generation in Wasco, OR · In queue since September 2023 · Proposed COD October 2025
117 MW
Capacity
1
Components
Solar
2y 8m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 1m
Schedule
7 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-10-01
BPA-G0937 is a proposed solar generation project with a total capacity of 117 MW, located in Wasco County, Oregon. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of September 18, 2023, and a proposed commercial operation date of October 1, 2025. The interconnection agreement status is listed as "In Progress (unknown study)".
The point of interconnection (POI) for the project is the Chemoweth Substation, with alternates at the Quenett Creek Substation and the Chenoweth-Goldendale No 1 115kV line.
Generated from interconnection queue and public data sources
State
OR
County
Wasco
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Chemoweth Substation; Alternates: Quenett Creek Substation & Chenoweth-Goldendale No 1 115kV line.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0937