Project BPA-G0942 — Project Summary

Queue ID
BPA-G0942
Capacity
20 MW
Technology
Battery
Status
active
Location
Thurston, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0942

BPA-G0942BetaActiveBatteryBPALBNL

20 MW storage in Thurston, WA · In queue since September 2023 · Proposed COD December 2026

20 MW

Capacity

1

Components

Battery

2y 8m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

3y 3m

In Study38%
Queue EntrySep 29, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-12-31

About

BPA-G0942 is a proposed 20 MW battery storage project located in Thurston County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of September 29, 2023. The proposed commercial operation date is December 31, 2026.

The interconnection agreement for BPA-G0942 is currently in progress, with the specific study type unknown. The point of interconnection is the Olympia Substation.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Thurston

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Olympia Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0942