Project BPA-G0943 — Project Summary

Queue ID
BPA-G0943
Capacity
1 MW
Technology
Solar
Status
active
Location
Snohomish, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0943

BPA-G0943BetaActiveSolarBPALBNL

1 MW generation in Snohomish, WA · In queue since October 2023 · Proposed COD September 2024

1 MW

Capacity

1

Components

Solar

2y 7m

In Queue

In Progress (unknown study)

IA Status

COD target: 2024

Interconnection

Total Duration

11 months

Schedule

19 months past proposed COD

In Study38%
Queue EntryOct 2, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2024-09-30

About

BPA-G0943 is a proposed 1 MW solar generation project located in Snohomish County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of October 2, 2023, and a proposed commercial operation date of September 30, 2024. The interconnection agreement status is listed as "In Progress (unknown study)".

The development project consists of 1 MW of solar photovoltaic generation. The point of interconnection is Snohomish.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Snohomish

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Snohomish

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.