Project BPA-G0953 — Project Summary

Queue ID
BPA-G0953
Capacity
600 MW
Technology
Wind
Status
active
Location
Lincoln, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0953

BPA-G0953BetaActiveWindBPALBNL

600 MW generation in Lincoln, WA · In queue since October 2023 · Proposed COD September 2026

600 MW

Capacity

1

Components

Wind

2y 7m

In Queue

In Progress (unknown study)

IA Status

COD target: 2026

Interconnection

Total Duration

2y 11m

In Study38%
Queue EntryOct 5, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2026-09-01

About

BPA-G0953 is a proposed 600 MW wind generation project in Lincoln County, Washington. The development project is located in the West region and is being managed through the Bonneville Power Administration (BPA) interconnection queue. The project entered the queue on October 5, 2023, with a proposed commercial operation date of September 1, 2026.

The interconnection agreement for BPA-G0953 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is yet to be determined.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Lincoln

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

TBD

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.

No ask pi reports yet for this entity.

ask pi about Project BPA-G0953