350 MW generation in Lincoln, WA · In queue since October 2023 · Proposed COD September 2026
350 MW
Capacity
1
Components
Wind
2y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2026
Total Duration
2y 11m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2026-09-01
BPA-G0955 is a proposed wind generation project with a total capacity of 350 MW, located in Lincoln County, Washington. The project is listed in the Bonneville Power Administration interconnection queue, with an entry date of October 6, 2023, and a proposed commercial operation date of September 1, 2026. The interconnection agreement status is currently listed as "In Progress (unknown study)".
The development project consists solely of wind generation, with the full 350 MW capacity attributed to this technology. No developer is specified in the queue data. The point of interconnection is yet to be determined.
Generated from interconnection queue and public data sources
State
WA
County
Lincoln
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
TBD
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0955