BPA-G0970
160 MW hybrid in Polk, OR · In queue since October 2023 · Proposed COD December 2028
160 MW
Capacity
2
Components
Biofuel + Battery
2y 7m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
5y 2m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
BPA-G0970 is a proposed 160 MW hybrid development project located in Polk County, Oregon. The project, which appeared in a recent news article, consists of an 80 MW biofuel component and an 80 MW battery energy storage system. It is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of October 13, 2023, and a proposed commercial operation date of December 1, 2028.
The interconnection agreement (IA) for BPA-G0970 is currently in progress, with the specific study phase unknown. The point of interconnection (POI) is the Salem-Albany No 2 115kV line.
Generated from interconnection queue and public data sources
State
OR
County
Polk
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Salem-Albany No 2 115kV line.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0970