BPA-G0980
300 MW generation in Sherman, OR · In queue since November 2023 · Proposed COD September 2028
300 MW
Capacity
1
Components
Wind
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-01
BPA-G0980 is a proposed wind generation project with a total capacity of 300 MW. The project is located in Sherman County, Oregon, and is being managed within the Bonneville Power Administration (BPA) interconnection queue. The queue entry date is November 3, 2023, with a proposed commercial operation date of September 1, 2028. The interconnection agreement status is currently listed as "In Progress (unknown study)". The point of interconnection is the John Day Substation at 500 kV.
The project consists of 300 MW of wind generation capacity. It is currently listed as an active project within the BPA queue. The project has appeared in recent news coverage regarding renewable energy development in the Pacific Northwest.
Generated from interconnection queue and public data sources
State
OR
County
Sherman
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
John Day Substation at 500 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0980