BPA-G0985
300 MW hybrid in Lincoln, WA · In queue since November 2023 · Proposed COD December 2027
300 MW
Capacity
2
Components
Solar + Battery
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
BPA-G0985 is a proposed 300 MW hybrid solar and battery project located in Lincoln County, Washington. The project consists of 150 MW of solar generation paired with 150 MW of battery energy storage. It is listed in the Bonneville Power Administration interconnection queue with a queue entry date of November 3, 2023, and a proposed commercial operation date of December 31, 2027.
The interconnection request, designated BPA-G0985, is currently listed as "In Progress (unknown study)" for its Interconnection Agreement (IA) status. The proposed point of interconnection (POI) is the Creston Substation, configured to loop into the BPA station on the Grand Coulee Creston No 1 115kV line, with an alternate POI at Wagner.
Generated from interconnection queue and public data sources
State
WA
County
Lincoln
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Creston Substation, Configuration: Loop into BPA station. Grand Coulee Creston No 1 115kV line Alternate: Wagner
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.