BPA-G0987
200 MW generation in Spokane, WA · In queue since November 2023 · Proposed COD September 2028
200 MW
Capacity
1
Components
Wind
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-01
BPA-G0987 is a proposed wind generation project located in Spokane County, Washington, with a total capacity of 200 MW. The project, interconnected within the Bonneville Power Administration (BPA) queue, entered the queue on November 6, 2023, and has a proposed commercial operation date of September 1, 2028. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".
The project consists of 200 MW of wind generation capacity. The point of interconnection (POI) is the Grand Coulee-Bell No 6 500 kV line. The developer is listed as BPA.
Generated from interconnection queue and public data sources
State
WA
County
Spokane
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Grand Coulee-Bell No 6 500 kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.