Project BPA-G0996 — Project Summary

Queue ID
BPA-G0996
Capacity
400 MW
Technology
Solar
Status
active
Location
Douglas, OR
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G0996

BPA-G0996BetaActiveSolarBPALBNL

400 MW generation in Douglas, OR · In queue since November 2023 · Proposed COD December 2029

400 MW

Capacity

1

Components

Solar

2y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2029

Interconnection

Total Duration

6y 1m

In Study38%
Queue EntryNov 6, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

About

BPA-G0996 is a proposed solar generation project located in Douglas County, Oregon, with a total capacity of 400 MW. The project consists of 400 MW of solar photovoltaic generation. It is listed in the Bonneville Power Administration interconnection queue with an entry date of November 6, 2023, and a proposed commercial operation date of December 1, 2029. The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection is the Grand Coulee-Schultz No 1 500kV line.

Generated from interconnection queue and public data sources

Project Details

State

OR

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Grand Coulee-Schultz No 1 500kV line.

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.