BPA-G0997
300 MW generation in Curry, OR · In queue since November 2023 · Proposed COD September 2028
300 MW
Capacity
1
Components
Wind
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
4y 10m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-09-01
BPA-G0997 is a proposed wind generation project with a total capacity of 300 MW. The project is located in Curry County, Oregon, and is being developed within the Bonneville Power Administration (BPA) service area. It entered the BPA interconnection queue on November 7, 2023, with a proposed commercial operation date of September 1, 2028.
The interconnection agreement (IA) status for BPA-G0997 is currently "In Progress (unknown study)". The point of interconnection (POI) is the Bandon _x0013_ Rogue No 1 115 kV line. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
OR
County
Curry
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Bandon _x0013_ Rogue No 1 115 kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.