BPA-G0998
1,120 MW generation in Benton, WA · In queue since November 2023 · Proposed COD December 2030
1,120 MW
Capacity
1
Components
Nuclear
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2030
Total Duration
7y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2030-12-31
BPA-G0998 is a proposed nuclear generation project located in Benton County, Washington, with a total capacity of 1120 MW. The project is listed in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 15, 2023. The proposed commercial operation date is December 31, 2030.
The interconnection agreement status is listed as "In Progress (unknown study)". The point of interconnection (POI) is the Ashe Substation at 230kV and 500 kV.
Generated from interconnection queue and public data sources
State
WA
County
Benton
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Ashe Substation at 230kV and 500 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G0998