BPA-G1004
10 MW generation in Franklin, WA · In queue since November 2023 · Proposed COD December 2025
10 MW
Capacity
1
Components
Solar
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2025
Total Duration
2y 1m
Schedule
4 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2025-12-31
BPA-G1004 is a proposed solar generation project located in Franklin County, Washington, with a total capacity of 10 MW. The project consists of 10 MW of solar photovoltaic generation. It is listed in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 16, 2023, and a proposed commercial operation date of December 31, 2025. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the Connell Tap on the Benton-Scooteney line.
Generated from interconnection queue and public data sources
State
WA
County
Franklin
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Connell Tap on the Benton-Scooteney line.
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1004