BPA-G1008
286 MW generation in Clark, WA · In queue since November 2023 · Proposed COD June 2024
286 MW
Capacity
1
Components
Gas
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2024
Total Duration
7 months
Schedule
23 months past proposed COD
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2024-06-15
BPA-G1008 is a proposed 286 MW gas-fired generation project located in Clark County, Washington. The project is listed in the Bonneville Power Administration (BPA) interconnection queue with an entry date of November 17, 2023, and a proposed commercial operation date of June 15, 2024. The point of interconnection is the Alcoa 115kV Substation.
The interconnection status for BPA-G1008 is listed as "In Progress (unknown study)". The developer is listed as BPA. The project has appeared in recent news.
Generated from interconnection queue and public data sources
State
WA
County
Clark
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Alcoa 115kV Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1008