Project BPA-G1014 — Project Summary

Queue ID
BPA-G1014
Capacity
250 MW
Technology
Battery
Status
active
Location
King, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1014

BPA-G1014BetaActiveBatteryBPALBNL

250 MW storage in King, WA · In queue since November 2023 · Proposed COD December 2029

250 MW

Capacity

1

Components

Battery

2y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2029

Interconnection

Total Duration

6y 1m

In Study38%
Queue EntryNov 21, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-31

About

BPA-G1014 is a proposed 250 MW battery storage project located in King County, Washington. The project is in the Bonneville Power Administration (BPA) interconnection queue, with an entry date of November 21, 2023, and a proposed commercial operation date of December 31, 2029. The point of interconnection is the Covington Substation.

The interconnection agreement for BPA-G1014 is currently listed as "In Progress (unknown study)". The development project consists solely of battery storage with a total capacity of 250 MW.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

King

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Covington Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.