BPA-G1017
1,023.6 MW hybrid in Klamath, OR · In queue since November 2023 · Proposed COD June 2029
1,023.6 MW
Capacity
2
Components
Solar + Battery
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2029
Total Duration
5y 7m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2029-06-01
BPA-G1017 is a proposed 1023.6 MW hybrid solar and battery project located in Klamath County, Oregon. The development project consists of a 508.5 MW solar array coupled with a 515.1 MW battery energy storage system. Interconnection is with the Bonneville Power Administration (BPA) at the LaPine-Chiloquin No 1 230kV line.
The project entered the BPA interconnection queue on November 21, 2023, with a proposed commercial operation date of June 1, 2029. The interconnection agreement (IA) status is currently listed as "In Progress (unknown study)".
Generated from interconnection queue and public data sources
State
OR
County
Klamath
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
LaPine-Chiloquin No 1 230kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.