BPA-G1021
530.4 MW generation in Cowlitz, WA · In queue since November 2023 · Proposed COD December 2028
530.4 MW
Capacity
1
Components
Wind
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
5y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
BPA-G1021 is a proposed wind generation project located in Cowlitz County, Washington, with a total capacity of 530.4 MW. The project is listed in the Bonneville Power Administration (BPA) interconnection queue, having entered the queue on November 21, 2023. The proposed commercial operation date is December 1, 2028.
The interconnection agreement for BPA-G1021 is currently in progress, with the specific study phase not specified. The point of interconnection is the Lexington Substation. The project has appeared in recent news coverage regarding renewable energy development in the Pacific Northwest.
Generated from interconnection queue and public data sources
State
WA
County
Cowlitz
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Lexington Substation
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1021