Project BPA-G1022 — Project Summary

Queue ID
BPA-G1022
Capacity
530.4 MW
Technology
Wind
Status
active
Location
Cowlitz, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1022

BPA-G1022BetaActiveWindBPALBNL

530.4 MW generation in Cowlitz, WA · In queue since November 2023 · Proposed COD November 2030

530.4 MW

Capacity

1

Components

Wind

2y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2030

Interconnection

Total Duration

7 years

In Study38%
Queue EntryNov 21, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2030-11-15

About

BPA-G1022 is a proposed wind generation project with a total capacity of 530.4 MW. The project is located in Cowlitz County, Washington, and is interconnected within the Bonneville Power Administration (BPA) queue. The queue entry date is November 21, 2023, with a proposed commercial operation date of November 15, 2030.

The interconnection agreement (IA) status for BPA-G1022 is currently listed as "In Progress (unknown study)". The point of interconnection (POI) is the Lexington Substation.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Cowlitz

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Lexington Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.