Project BPA-G1025 — Project Summary

Queue ID
BPA-G1025
Capacity
1554 MW
Technology
Solar+Battery
Status
active
Location
Douglas, WA
Region
West
Developer
IA Status
In Progress (unknown study)

BPA-G1025

BPA-G1025BetaActiveSolarWindBatteryBPALBNL

1,554 MW hybrid in Douglas, WA · In queue since November 2023 · Proposed COD December 2029

1,554 MW

Capacity

3

Components

Solar + Wind + Battery

2y 6m

In Queue

In Progress (unknown study)

IA Status

COD target: 2029

Interconnection

Total Duration

6y 1m

In Study38%
Queue EntryNov 21, 2023

Interconnection request submitted to ISO/RTO

Interconnection StudyCurrent

Project undergoes interconnection studies to assess grid impact.

Typical: 18–36 months

Interconnection Agreement

Interconnection agreement not yet executed

Typical: 30–60 days (negotiation)

Commercial Operation

Proposed COD: 2029-12-01

Technology
Solar508.5 MW · 33%
Wind530.4 MW · 34%
Battery515.1 MW · 33%
About

BPA-G1025 is a proposed 1554 MW hybrid energy project in Douglas County, Washington. Interconnecting to the Bonneville Power Administration (BPA) via the Columbia Substation, the project entered the BPA interconnection queue on November 21, 2023, with a proposed commercial operation date of December 1, 2029. The interconnection agreement is currently listed as "In Progress (unknown study)".

The project combines 508.5 MW of solar, 530.4 MW of wind, and 515.1 MW of battery storage.

Generated from interconnection queue and public data sources

Project Details

State

WA

County

Douglas

Grid Region

Mountain West

Market

Developer

Utility

Bonneville Power Administration

Entity

BPA

Service Type

Point of Interconnection

Columbia Substation

Data Source

LBNL

Market Context
Approximate
ISO / RTO
MOUNTAIN_WEST
Trading Hub
MID-C
Hub Confidence
UNKNOWN

This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.

No news available for this project.