BPA-G1027
260 MW generation in Umatilla, OR · In queue since November 2023 · Proposed COD December 2028
260 MW
Capacity
1
Components
Solar
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2028
Total Duration
5y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2028-12-01
BPA-G1027 is a proposed solar generation project located in Umatilla County, Oregon, with a total capacity of 260 MW. The project is listed in the Bonneville Power Administration interconnection queue as of November 21, 2023. Its proposed commercial operation date is December 1, 2028.
The interconnection agreement for BPA-G1027 is currently listed as "In Progress (unknown study)". The point of interconnection is the Stanfield Substation at 230 kV.
Generated from interconnection queue and public data sources
State
OR
County
Umatilla
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Stanfield Substation at 230 kV
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1027