BPA-G1029
125 MW generation in Benton, WA · In queue since November 2023 · Proposed COD December 2027
125 MW
Capacity
1
Components
Solar
2y 6m
In Queue
In Progress (unknown study)
IA Status
COD target: 2027
Total Duration
4y 1m
Interconnection request submitted to ISO/RTO
Project undergoes interconnection studies to assess grid impact.
Typical: 18–36 months
Interconnection agreement not yet executed
Typical: 30–60 days (negotiation)
Proposed COD: 2027-12-31
BPA-G1029 is a proposed solar generation project with a total capacity of 125 MW, located in Benton County, Washington. The project is listed in the Bonneville Power Administration interconnection queue, with an entry date of November 21, 2023, and a proposed commercial operation date of December 31, 2027. The interconnection agreement status is listed as "In Progress (unknown study)".
The project consists of 125 MW of solar generation. It is located in the western United States. The point of interconnection is the Grandview-Red Mountain No 1 115 kV line.
Generated from interconnection queue and public data sources
State
WA
County
Benton
Grid Region
Mountain West
Market
—
Developer
—
Utility
Bonneville Power Administration
Entity
BPA
Service Type
—
Point of Interconnection
Grandview-Red Mountain No 1 115 kV line
Data Source
LBNL
- ISO / RTO
- MOUNTAIN_WEST
- Trading Hub
- MID-C
- Hub Confidence
- UNKNOWN
This project's market context is estimated from its Point of Interconnection. Hub and node assignments are approximate and based on geographic inference from the POI substation name.
No ask pi reports yet for this entity.
ask pi about Project BPA-G1029